Environmental Operations

Due to additional and more stringent regulations placed on operators of hazardous and nonhazardous waste disposal wells by the Federal Environmental Protection Agency, FEPA, McWolex Inc recognizes the need for a complete engineering firm to deal with the unique problems found in these types of well.

McWolex Inc Engineers and field supervisors can perform work from mechanical integrity tests to complete workover operations in compliance with all FEPA guidelines and regulations.

McWolex Inc Engineers can perform environmental studies including:

» Base line studies

» Pre and post impact assessment (PIA)

» Monitoring (EER)

» Auditing (EIA)

» Sampling formation and groundwater

» Installing groundwater monitoring bores

» Hydrological groundwater modeling studies

» Rising head tests

» Lugeon packer tests

» Installation of landfill gas extraction wells